New Multi-Specialty Outpatient Clinics
About the Project
After more than 15 years of serving the Redwood City community, Stanford Medicine is increasing access to our vibrant regional network of specialized outpatient care to serve patients closer to where they live and work. We are building new multi-specialty clinics adjacent to the existing Stanford Medicine Outpatient Clinic. The new building is expected to open for patient care in late 2027.
Project Highlights
- Expanded clinical and nonclinical space
- Specialty services including cardiovascular health, women's health, and LGBTQ+ health
- Free-standing parking garage
- Oval entry loop for easy drop-offs and pick-ups
- Flexible design to allow for advancements in technology and future care delivery
- Dedicated open space with outdoor seating
Renderings
Update for: May 4 — May 15, 2026
As part of our ongoing efforts to expand access to outpatient healthcare services in Redwood City, construction continues to progress steadily on the Multi-Specialty Outpatient Clinics Building. This facility will support a wide range of specialty care services for the community.
Location: 500 Broadway
Work Hours: Mon. – Fri., 7 a.m. – 8 p.m.; Sat., 9 a.m. – 4 p.m.
For questions, email construction@stanfordhealthcare.org.
Work will continue on the site, parking structure, and building areas.
- Exterior work: Crews will continue positioning, welding, aligning, and securing precast wall panels. Installation of exterior glass will continue. Framing of the rooftop unit exterior walls and roof edge is underway.
- Interior progress: Workers will continue installing plumbing, electrical, and low-voltage systems. Interior work will include wall framing, drywall installation, taping, priming, and painting. Fire protection systems will continue to be installed and undergo functional testing.
- Ground-level work: Workers will continue sidewalk and landscaping restoration in support of underground utility efforts. Crews will perform underground boring and excavation to install outside plant infrastructure within surface parking areas. Installation of underground storm drainage piping will continue.
- Parking structure: Crews will continue basement waterproofing, installation of shotcrete walls and vertical supports, and installation of mechanical, electrical, and plumbing systems beneath the structure.
- Noise: Normal construction noise, with potentially louder periods from digging and demolition work in the parking areas.
- Vibrations: You may feel some light ground vibrations while heavy equipment is in use.
- Traffic: Please note these important access changes:
- The Pavilion A/B driveway from Broadway Street is closed through late 2027.
- The surface parking lot next to Pavilion A is now permanently closed.
- Be aware of temporary access changes near parking areas due to ongoing utility work.
Parking will be limited at the Redwood City Outpatient Center as part of construction for the Redwood City Medical Office Building (500 Broadway). Golf carts are available on demand to provide transportation to and from vehicles by calling or texting 650-736-8000 or using a call box in the above ground garage or near the Pavilion entrances.
Impacts include closure of the following: 1) Pavilion A/B driveway entry, 2) parking at Pavilion A surface lot, and 3) underground and above ground garage entry/exit near Pavilion A. Additional upcoming impacts can be found on the